Pre-Design Investigation
KOMAN recently conducted a Pre-Design Investigation (PDI) at Site 43 in Indian Head. The purpose was to gather additional multimedia data and conduct tests to support the remedial design conceptually outlined in the Draft Feasibility Study Report. The study aimed to achieve several goals: Refine trichloroethene (TCE) concentrations in soil to meet the Preliminary Remediation […]
Pre-Design Investigation Read More »